Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ajax-search-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121
University Hospital, Girona - Canal Contract Aragon

Healthcare

University Hospital, Girona

Girona, Spain
Design and manufacturing of air conditioning units with high energy and noise efficiency performance
Arasaf undertook the extension and renovation of the Emergency Department at the "Doctor Josep Trueta" Girona University Hospital. The company was responsible for the calculating, designing and manufacturing air conditioning units in collaboration with different engineering, installation and other sector professionals, offering specific and bespoke characteristics. The development and manufacture of equipment for Girona Hospital was a challenge for Arasaf on both a human and a professional level given the particularities of the project and the requirements requested. These were resolved to the satisfaction of both the client and the board at the hospital.

Creative

The manufacture of seven air handling units was one of the most important projects undertaken in the health sector. With the help of cutting-edge calculation programs for the HVAC industry, Arasaf provided individual solutions to each and every one of their teams, collaborating with project managers to achieve total satisfaction in all sections: technical characteristics, appropriate size, versatility, comfort, safety and hygiene. As manufacturers of air conditioning equipment, they opted for technological development and innovation in the search for the highest performance in terms of energy efficiency, sound level, structural design and a full range of solutions in any air conditioning project.