Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ajax-search-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121
Eurobuilding Hotels - Canal Contract Aragon

Hotels

Eurobuilding Hotels

Caracas, Venezuela
Fittings for two hotels with over 500 rooms
The Miami Eurobuilding Hotel is a new construction intended to be built near Miami International Airport, in the centre of the city. The complex comprises a total of 133 rooms. MZ del Río was chosen to design the shower fixtures. A specific development was initiated, with a very large space that required the integration of several ceiling sprinklers and shower handles. All the parts are contained within the same fixture and are operated via common control units. Great care was taken with this installation to apply water-saving techniques. The fixtures are equipped with water reducers and hot water saving systems.