Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ajax-search-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121
Hotel Princess Tenerife Guayarmina - Canal Contract Aragon

Hotels

Hotel Princess Tenerife Guayarmina

Canary Islands. Spain
Custom double sink countertops for 505 rooms in a Canary Islands resort
The resort is located in Costa Adeje, a prime location some 150 metres from the beach in the south of this Canary Island. Kyrya Group equipped the hotel's 505 rooms with double-basin countertops, integrated towel racks and bespoke storage solutions. This personalised intervention melds the finest features, amenities and design.