Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ajax-search-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arex/domains/contractaragon.com/public_html/wp-includes/functions.php on line 6121
Bloquetech - Canal Contract Aragon

Bloquetech

Comprehensive engineering, design, BIM and Industry 4.0 services and solutions

Bloquetech is a service company specialising in engineering, BIM in any of its phases, integral design consultancy and industry 4.0 through the application of technology and consultancy for industrial organisation. They have the capacity to tackle any project from the initial creative phases, through the development of constructive solutions, and on to production and implementation. They work on anything from product development to the design of spaces (corporate, technological, museum, etc.). The company has experience in sectors closely related to the contract channel, such as architecture/construction, retail/interior design, mobility/transport and leisure, among others. To pursue their projects, Bloquetech has a multidisciplinary team (engineers, architects and designers) comprising over 50 people.